          Proceedings of the 18
        
        
          th
        
        
          International Conference on Soil Mechanics and Geotechnical Engineering, Paris 2013
        
        
          Massad 2005 2010).
        
        
          A third experimental fill (Pilot Embankment 3), built also in
        
        
          Area 3, with a maximum height of 6.7m, behaved in a similar
        
        
          way, with c
        
        
          
            v
          
        
        
          /
        
        
          
            H
          
        
        
          
            2
          
        
        
          
            d
          
        
        
          averaging 1.8.10
        
        
          -2
        
        
          /day; the
        
        
          
            EOP
          
        
        
          settlement
        
        
          was ~80 cm and 95% of this value was reached after ~6 month.
        
        
          6 CONCLUSIONS
        
        
          Due to the high
        
        
          
            OCR
          
        
        
          values of the SFL Clays, the
        
        
          
            c
          
        
        
          
            v
          
        
        
          were also
        
        
          high, of the order or 10
        
        
          -2
        
        
          cm
        
        
          2
        
        
          /s. As a consequence, there was no
        
        
          need to use geodrains in the Embraport site.
        
        
          This conclusion was supported by 3 experimental earth fills
        
        
          without geodrains and, more important, by the monitoring of
        
        
          settlements in Area 3, where temporary surcharges were used.
        
        
          
            0
          
        
        
          
            5
          
        
        
          
            10
          
        
        
          
            15
          
        
        
          
            20
          
        
        
          
            25
          
        
        
          
            30
          
        
        
          
            35
          
        
        
          0,0
        
        
          2,0
        
        
          4,0
        
        
          Depth (m)
        
        
          OCR
        
        
          0
        
        
          5
        
        
          10
        
        
          15
        
        
          20
        
        
          25
        
        
          30
        
        
          35
        
        
          0
        
        
          100
        
        
          200
        
        
          300
        
        
          400
        
        
          Depth (m)
        
        
          Pressures (kPa)
        
        
          Sand
        
        
          Clayey Sand (Mangrove)
        
        
          Sand
        
        
          SFL Clay
        
        
          Clayey Sand (SFL)
        
        
          Sand (SFL)
        
        
          SFL Clay
        
        
          0
        
        
          2
        
        
          4
        
        
          6
        
        
          8
        
        
          10
        
        
          0
        
        
          40
        
        
          80
        
        
          120
        
        
          0
        
        
          50
        
        
          100
        
        
          150
        
        
          200
        
        
          250
        
        
          Fill  Level (m)
        
        
          Settlemt (cm)
        
        
          PLATE PR-D6
        
        
          Measured
        
        
          Olson´s Theory
        
        
          Fill
        
        
          c
        
        
          v
        
        
          /H
        
        
          2
        
        
          d
        
        
          =1.3.10
        
        
          -2
        
        
          /day
        
        
          (b)
        
        
          0
        
        
          2
        
        
          4
        
        
          6
        
        
          8
        
        
          10
        
        
          0
        
        
          50
        
        
          100
        
        
          150
        
        
          0
        
        
          50
        
        
          100
        
        
          150
        
        
          200
        
        
          250
        
        
          Fill  Level (m)
        
        
          Settlemt (cm)
        
        
          t- Time (days)
        
        
          PLATE PR-B5
        
        
          Fill
        
        
          c
        
        
          v
        
        
          /H
        
        
          2
        
        
          d
        
        
          =1.3.10
        
        
          -2
        
        
          /day
        
        
          (a)
        
        
          Figure 9: Subsoil profile, pressures and OCR – Pilot Embankment 2
        
        
          0
        
        
          10
        
        
          20
        
        
          30
        
        
          40
        
        
          50
        
        
          60
        
        
          0
        
        
          20
        
        
          40
        
        
          6
        
        
          
        
        
          (n+1)
        
        
          (cm)
        
        
          
        
        
          n
        
        
          (cm)
        
        
          0
        
        
          c
        
        
          v
        
        
          /H
        
        
          d
        
        
          2
        
        
          ~2.10
        
        
          -2
        
        
          /day
        
        
          
        
        
          f
        
        
          =51.6cm
        
        
          
        
        
          f
        
        
          =20cm
        
        
          6,6m
        
        
          1,4m
        
        
          PR 206
        
        
          Stage 1
        
        
          Stage 2
        
        
          Figure 12:Analysis of settlements of earth fills of Area 3
        
        
          7 ACKNOWLEDGEMENTS
        
        
          The authors are grateful to the disposal of data by
        
        
          ODEBRECHT INFRAESTRUTURA and EMBRAPORT S.A.
        
        
          8 REFERENCES
        
        
          Andrade M. E. S. 2009. Contribution to the Study of the Soft Clays of
        
        
          Baixada Santista. MSc Thesis, COPPE, 397p. (in Portuguese).
        
        
          Baguelin F. 1999. La détermination des Tassements Finaux de
        
        
          Consolidation: une Alternative à la Méthode d´Asaoka. Revue
        
        
          Française de Géotechnique no 86: 9-17.
        
        
          Figure 10: Asaoka’s Method - Pilot Embankment 2
        
        
          5,133333
        
        
          0
        
        
          200
        
        
          400
        
        
          600
        
        
          800
        
        
          1000
        
        
          0 50 100 150 200 250 300 350 400 450
        
        
          v.t (mm)
        
        
          t - Time (days)
        
        
          Olson´s Theory
        
        
          Measured
        
        
          0
        
        
          1
        
        
          2
        
        
          3
        
        
          4
        
        
          5
        
        
          6
        
        
          0
        
        
          20
        
        
          40
        
        
          60
        
        
          80
        
        
          0 50 100 150 200 250 300 350 400 450
        
        
          Fill  Level (m)
        
        
          Settlemt (cm)
        
        
          t- Time (days)
        
        
          Fill
        
        
          (a)
        
        
          Stage 2
        
        
          Stage 1
        
        
          6,6m
        
        
          1,4m
        
        
          PR 206
        
        
          (b)
        
        
          v=settlement velocity
        
        
          KulhawayF.H. and Mayne P. N. 1990.Manual on Estimating Soil
        
        
          Properties for Foundation Design. Report EL-6800, Electric Power
        
        
          Research Institute, Palo Alto.
        
        
          MassadF. 2005. Marine Soft Clays of Santos, Brazil:
        
        
          BuildingSettlements And Geological History. Proc. 16th ICSMGE.
        
        
          Osaka, Japan. v. 2: 405-408.
        
        
          MassadF. 2009-a. Marine Clays of BaixadaSantista – Characteristics
        
        
          and Geotechnical Properties.S.Paulo: Ofic.Textos (in Portuguese).
        
        
          MassadF.2009-b.Stress history and preconsolidation pressure evaluation
        
        
          from SCPTU.Proc.17th ICSMGE. Alexandria, Egypt, v.2. p.961 -
        
        
          964.
        
        
          MassadF.2010. Tall buildings in Santos City: unexpected behavior of
        
        
          the old shallow foundations and the newly long piles.New
        
        
          Techniques on Soft Soils.S.Paulo: Ofic.deTextos, v.1, p. 269-288.
        
        
          Olson,R. E. 1977. Consolidation Under Time Dependent Loading.
        
        
          Journal of the Geotechinical Division, ASCE, 103 (GT1): 55-60.
        
        
          PilotG. 1981. Methods of Improving the Engineering Properties of Soft
        
        
          Clays.In: Soft Clay Engineering. Edited by Brand, E. W. e Brenner,
        
        
          R. P.. Elsiver. p. 637-691
        
        
          Figure 11:Results of the Pilot Embankment 2 – Plate PR 206
        
        
          5 BEHAVIOR OF THE EARTH FILLS OF THE WORK
        
        
          The earth fills in Area 3 of Figure 1 were built with a temporary
        
        
          surcharge, in general of 80kPa. Tens of plates were installed to
        
        
          monitor the settlements. The time of surcharge removal, set to
        
        
          reach 95% of consolidation, was fixed between 6 and 8 months,
        
        
          or even more, depending on the time of construction.
        
        
          Rémy J. P. P.;Martins I.S.M.; Santa Maria P.E.L and Aguiar V.N. 2010.
        
        
          The Embraport Pilot Embankment – primary and secondary
        
        
          consolidations of Santos soft clay with and without wick drains.
        
        
          New Techn. Soft Soils.S.Paulo : Ofic. de Textos, v.1, p. 289-329.
        
        
          SayeS. R. 2001. Assessment of soil disturbance by the instalation of
        
        
          displacement sand drains and prefabricated vertical drains. GSP no.
        
        
          119, ASCE (American Society of Civil Engineers), USA.
        
        
          The settlements of two of these plates are shown in Figures 12-a
        
        
          and 12-b, together with the fittings with Olson´s Theory of
        
        
          Consolidation; the c
        
        
          
            v
          
        
        
          /
        
        
          
            H
          
        
        
          
            2
          
        
        
          
            d
          
        
        
          values were determined using the
        
        
          Method of Baguelin (1999), alternative to Asaoka´s Method. In
        
        
          these cases, 6 months was enough for surcharge removal.
        
        
          Teixeira A.H.  1960. Typical Subsoil Conditions and Settlement
        
        
          Problems in Santos, Brazil. Congresso Panamericano de Mecánica
        
        
          de Suelos e Cimentaciones, México, I: 149-177 (in Portuguese).
        
        
          Teixeira A.H. 1994. Shallow Foudations in Baixada Santista. In: Solos
        
        
          do Litoral Paulista, ABMS - NRSP: 137-154 (in Portuguese)