1887
Technical Committee 206 /
Comité technique 206
Integrated responsibility for both design and construction.
High ground heterogeneity and/or uncertainty in failure
mechanism.
7 REFERENCES
Displacements as leading design characteristic.
Short project duration in relation with beneficial short term
behaviour of soil.
Allagnat, D. (editor). 2005.
La Méthode observationnelle pour le
dimensionnement interactif des ouvrages
. (The observational
method for the interactive design of structures). Guide Technique,
Presses de l’ENPC
Chapman, T. and Green, G. 2004. Observational method looks set to cut
city building costs.
Proceedings of ICE Civil Engineering
157,
125–133 Paper 13416
Flexible and risk based culture.
Critical attitude of stakeholders related to the project.
Best way out.
Cools, P.M.C.B.M. 2011. The Geo-Impuls Programme reducing
geotechnical failure in the Netherlands.
ISGSR 2011
in Vogt,
Schuppener, Straub & Bräu eds Bundesanstalt für Wasserbau
No go:
Glass, P.R. and Powderham, A.J. 1994. Application of the observational
method at Limehouse Link.
Geotechnique
44, No. 4, 665-679.
Too little time between measurements and measures.
Quickly changing loads.
Grote, B.J.H. and van Dalen, J.H. 2012. Onzeker kalksteen in grip met
Observational Method,
Land + Water
, 12
Failure mechanism/parameter is not measurable.
Change of failure mechanism during construction.
Measurements only useful after failure.
Costs for changes during construction are higher than
benefits minus costs for monitoring.
Hitchcock, A. 2003. Elimination of temporary propping using the
observational method on the Heathrow airside road tunnel project.
Ground Engineering Magazine
. Vol. 36, No. 5, 30-33
Huybrechts, N. 2000. Design Tools in Geotechnics – Observational
Method and Finite Element Method.
GeoTechNet Project GTC2-
2000-33033, WP3: Innovation
To be overcome:
Kamp, R.A.J. van de. 2003.
Observatiemethode voor diepe bouwputten
(In Dutch). MSc. Thesis Delft University of Technology
Communication between site and design office.
Unwillingness of authorities.
Karlsrud, K. and Andresen, L. 2008. Design and performance of deep
excavations in soft clays.
6
th
international conference on case
histories in geotechnical engineering
, Arlington, VA. Paper No 12.
Time restrictions.
Calculation methods do not always allow easy use of OM.
Korevaar, M. 2012.
De Observational Method, Onderzoek naar een
veilige toepassing van deze methode voor bouwkuipen
(In Dutch).
MSc. Thesis Delft University of Technology
Kovári, K. and Lunardi, P. 2000. On the observational method in
tunnelling.
Proceedings of the GeoEng 2000: an International
Conference on Geotechnical & Geological Engineering
, 19-24
november, 2000. Vol. 1, 692-707, Melbourne, Australia.
Lee, S. 2012. Application of the observational method for railway
earthwork stabilisation in the UK.
Presentation DGF Geoteknisk
monitering og observationsmetoden, Kopenhagen
.
Morgenstern, N. R. 1994. The observational method in environmental
geotechnics. In:
Proc. of 1st International Conference on
Environmental Geotechnics. Edmonton
, 965-976.
Muir Wood, A. 1990. The observational method revisited. In:
Proceedings of the 10th Southeast Asian Geotechnical Conference
,
Taipei, 2, 37-42.
Nicholson, D., Tse C.-M., Penny, C. 1999.
The Observational Method
in ground engineering: principles and applications
. CIRIA,
London, Report 185.
Nossan, A.S. 2006. Observations on the Observational Method.
XIII.
Danube-European Conference on Geotechnical Engineering.
Logar, J., Gaberc, A., Majes, B. (ed). - Ljubljana : Slovenian
Geotechnical Society. 171-178
Patel, D., Nicholson, D., Huybrechts, N. and Maertens, J. 2007. The
Observational Method in Geotechnics.
Proceedings of the 14
th
ECSMGE:
Madrid, Spain. Vol. 2, 365-370.
Peck, R. B. 1969. Advantages and limitations of the observational
method in applied soil mechanics.
Géotechnique
, 19 2, 171-187.
Powderham, A. J. 1994. An overview of the observational method:
development in cut and cover bored tunnelling projects.
Géotechnique
44 (4), 619-636.
Powderham, A.J. and Nicholson, D.P. 1996.
The Observational
method in geotechnical engineering
. ICE, Thomas Telford,
London.
Figure 2. Application of OM in Maastricht for A2Maastricht tunnel
(photo Reen van Beek)
Roberts, T.O.L. and Preene, M. 1994. The design of groundwater
systems using the observational method.
Géotechnique
44 (4), 727-
734.
Schmitt, P. and Schlosser, F. 2007. La méthode observationnelle : du
suivi géotechnique au dimensionnement interactif (in French)
)
.
Travaux
(Paris) Y. 2007, No. 844, 99-106
6 ACKNOWLEDGEMENTS
This research is performed as part of “Geoimpuls” in the
Netherlands; a joint industry programme, with the ambitious
goal to half the occurrence of geotechnical failure in Dutch civil
engineering projects by 2015. The authors wish to thank the
members of the OM working group for sharing their case
histories and experiences.