Table of Contents Table of Contents
Previous Page  451 / 479 Next Page
Information
Show Menu
Previous Page 451 / 479 Next Page
Page Background

CHALLENGES & INNOVATIONS

IN GEOTECHNICS

101

THURSDAY SEPTEMBER 5, 2013

Workshop TC 204+305 Uncommon underground constructions solving

mega-city problems

Ouvrages souterrains exceptionnels en réponse aux problèmes des

mégacités

Chairs /

Présidents :

A. Bezuijen (The Netherlands), A. Negro (Brazil)

TC 204-305 WS-1 Introduction

A. Bezuijen (The Netherlands), A. Negro (Brazil)

TC 204-305 WS-2 Cross-rail project in London

J. Standing (UK)

TC 204-305 WS-3 Geotechnical aspects of underground construction in problematical soils of

Saint -Petersburg (Russia) and Almaty (Kazakhstan)

A. Zhussusbekov (Kazakhstan)

TC 204-305 WS-4 Compensation grouting with shallow and deep foundations – case study from

the metro b1 in Rome

Kummerer (Austria)

TC 204-305 WS-5 Geotechnical engineering in subsiding Mexico City

G. Auvinet (Mexico)

TC 204-305 WS-6 A decade of construction works on your doorstep - evaluation of the

Amsterdam North South Line’s impact

M. Korf (The Nederlands)

WORKSHOP

14:00 - 15:30 – Room 252 B