Table of Contents Table of Contents
Previous Page  182 / 479 Next Page
Information
Show Menu
Previous Page 182 / 479 Next Page
Page Background

ISSMGE TECHNICAL COMMITTEE ANNUAL REPORT

TC206 - INTERACTIVE DESIGN

INTERACTIVE GEOTECHNICAL DESIGN

Date: 1

st

June 2011

Period covered by this report: October 2009 – May 2011

Prepared by: Ken Been

Chair:

Ken Been

Vice-Chair:

---

Secretary:

---

1.

Have you distributed the Terms of Reference

to the TC members?

NO

If not, please do so immediately.

2.

Are any TC members not responsive?

YES

If not, please name the persons not communicating so that

ISSMGE can contact their national societies.

Part of this is my problem – no need to go to the national

societies.

3.

Is your TC webpage on the ISSMGE website

up to date?

NO

If not, please describe the target date for the revision.

The terms of reference are not on the website (the TC

membership is up to date). These were submitted in late

2010 – have they been approved by the Overview Commit-

tee? (Note from TOC. This was an oversight, TOR are now

approved)

4.

Please list the conferences and workshops and other activi-

ties you have held or plan to hold.

The following were proposed in the Terms of Reference:

-

Arrange a conference on "Case Histories and Applica-

tions of Interactive Design" with published proceedings

-

Include a short course, before or after the conference, on

the Observational Method

-

Develop a short educational guide or brochure on the

observational, aimed at owners and other engineering

disciplines.

Please list the members of the TC, their function, e-mail

address and country

(adjust table as needed). Just refer to

the ISSMGE website if the information can be found there.

(See ISSMGE website)

5.

Please list the work ask(s) you assigned to TC members and

comment on progress and future plans. Include, where rele-

vant, target deadline and deliverable(s)

Work task

Responsible/deadline/deliverable

Progress

Future plans

This has not been done – I was waiting for feedback from the ISSMGE on "approval" of the Terms of Reference.

Volume 6 - Page 182